Hi,
Our VPRS cost is with condition category G. The billing was created on 20th of Jan with a pricing date of 25th Jan, and the system has calculated the VPRS cost based on material price valid on the 20th which is USD100. Please take note that this billing does not have a PGI document posted. So the VPRS cost is copied from material valuation standard price. Thereafter the user did a MR21 price change on the 22nd Jan to change the price to USD120. However when we try to re-update the prices now, the system is not re-calculating the VPRS price based on USD120.
Can someone please explain why the VPRS is not being recalculated from the latest material price valuation?